Posted Total Cost (LCY) Field, Job Planning Line Table
Displays the total cost (LCY) that has been posted to the job ledger, if the Usage Link check box has been selected.
You cannot change the contents of this field.
Tip
For more information on how to work with fields and columns, see Work with Data. For assistance in finding specific pages, see Search.
Parent Tables
Table | Location |
---|---|
Gen. Bus. Posting Group Field, Job Planning Line Table | Jobs |
Job Planning Line Table | Jobs |
Job Planning Line Table | Jobs |
Job Planning Line Table | Jobs |