Capacity Constrained Resource Table

Specifies finite loading of a work center or machine center.

This table enables you to set up resource that you regard as critical and mark them to accept a finite load instead of the default infinite load that other resources accept.

A critical area can be a work center or machine center that you have identified as a bottleneck and would like to establish a limited (finite) load for.

Note

Operations on work or machine centers set up as constrained resources will always be planned serially. This means that ever if a constrained resource has multiple capacities (the Capacity field on the work or machine center card is higher than 1), then those capacities can only be planned in sequence, not in parallel as would be the case if the work or machine center was not set up as a constrained resource.

List of Fields in the Table

Field Location
Prod. Order Need Qty. for Plan Field, Capacity Constrained Resource Table Manufacturing
Critical Load % Field, Capacity Constrained Resource Table Manufacturing
Prod. Order Need Qty. Field, Capacity Constrained Resource Table Manufacturing
Date Filter Field, Capacity Constrained Resource Table Manufacturing
Name Field, Capacity Constrained Resource Table Manufacturing
Dampener (% of Total Capacity) Field, Capacity Constrained Resource Table Manufacturing
Capacity No. Field, Capacity Constrained Resource Table Manufacturing
Work Shift Filter Field, Capacity Constrained Resource Table Manufacturing
Work Center Load Qty. for Plan Field, Capacity Constrained Resource Table Manufacturing
Work Center No. Field, Capacity Constrained Resource Table Manufacturing
Capacity (Effective) Field, Capacity Constrained Resource Table Manufacturing
Capacity Type Field, Capacity Constrained Resource Table Manufacturing
Work Center Load Qty. Field, Capacity Constrained Resource Table Manufacturing

See Also

Reference

Finite Loading
Critical Load %
Capacity

Other Resources

How to: Display the Load on Work Centers