Maintenance downtime on a work order is calculated based on which of the following options?
The specific job type that is on the work order
The time that is required in the functional location
The beginning time and ending time that you enter as downtime
The working hours that are set up in the calendar
Which of the following options best describes a maintenance checklist?
It is required on all work orders
It is populated automatically based on the job type
It is based on the specific asset
It is based on what is needed each time
Is it true that every work order result that is entered must include an update of the counter?
Yes
No