Step 3: Populating the staging database
Planning Server supports loading of ID-based tables from the staging database to the application database. Because only ID-based tables can be loaded, stored procedures are provided to help you prepare data that has labels in hierarchy and measure group tables.
In This Section
- About data preparation
Learn about the BizSystemFlag, and other important considerations for preparing data.
- About preparing dimension data
Learn about how to work with linked dimensions and attribute groups.
- About preparing hierarchy data
Learn about how to prepare hierarchy data. Also learn how to populate a hierarchy and how to prepare label-based data for hierarchies.
- About preparing measure group data for a model
Learn about how to prepare measure group and model data. Also learn about how to prepare label-based data for measure groups.