Share via


Set up master plans to include requisitions

Important

This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2

You can set up Microsoft Dynamics AX to include requisition demand in master scheduling. After this is set up, approved requisitions that have a purpose of replenishment are automatically released to master scheduling, and the fulfillment method for the demand created by these requisitions is automatically determined. It is determined by the supply policies that have been set up for the items in your organization and planned by using master scheduling. After a replenishment requisition has been created and approved, no additional user action is required.

In master plans, you can also enter the number of days in the past when demand from approved requisitions is included in master scheduling. For example, you can indicate if only unfulfilled, past-due demand from approved requisitions that were created in the last 10 days should be considered and planned for. In this case, demand created more than 10 days ago is disregarded.

Note

This functionality is supported only if the Master planning license code and the Master planning configuration key are enabled.

Set up master plans to include replenishment requisition demand

  1. Click Master planning > Setup > Plans > Master plans.

  2. On the General tab, in the Setup section, select the Include requisitions check box.

Set up a time fence for replenishment requisition demand

  1. Click Master planning > Setup > Plans > Master plans.

  2. On the Time fences tab, select the Approved requisitions check box to override the time fence settings that are defined for items. Then, enter the number of days in the past when demand from approved requisitions is included in master scheduling. For example, enter 10 if the system should only consider and plan for demand from approved requisitions that were created in the last 10 days.

See also

About purchase requisitions

Master plans (form)