ReqPlanData Class [AX 2012]
Syntax
class ReqPlanData
Run On
Called
Methods
Method | Description | |
---|---|---|
actionUpdReqDatePurch | ||
addReqLog | ||
addReqTransCache | ||
bottleneckScheduling | ||
cancelTimeOut | Cancels a previous method call to the setTimeOut method. (Inherited from Object.) | |
checkForPickup | ||
covCapLimited | ||
covPropertyLimited | ||
covSchedMethod | ||
covTimeFenceSchedBack | ||
createReqLogRestorePoint | ||
currentReqPlanForecast | ||
doActionCalc | ||
doAutoFirmPo | ||
doCovCalc | ||
doFuturesCalc | ||
dynamicNegativeDays | ||
equal | Determines whether the specified object is equal to the current one. (Inherited from Object.) | |
forecastModelId | Retrieves the inventory forecast model ID for the current master plan. | |
futuresSched | ||
futuresUpdReqDateKanban | Indicates whether planned kanbans should be postponed to the futures date. | |
futuresUpdReqDatePurch | ||
futuresUpdReqDateTransfer | ||
getReqCovDimIdCache | Gets the cache that is used for computing the MRP coverage dimension for the ReqTrans records of type BOM line. | |
getTimeOutTimerHandle | Returns the timer handle for the object. (Inherited from Object.) | |
handle | Retrieves the handle of the class of the object. (Inherited from Object.) | |
incrementRetryReqLog | ||
init | Initializes an instance of the ReqPlanData class. | |
initReqLog | Initializes the master planning log record. | |
initReqTransCache | Initializes the requirements transactions cache. | |
insertReqLog | Inserts a record into the master planning log table. | |
marginCalendarDays | ||
marginIssue | ||
marginOrder | ||
marginReceipt | ||
mayTransBeActionAdvanced | ||
mayTransBeActionCovFrom | ||
mayTransBeActionCovTo | ||
mayTransBeActionDecreased | ||
mayTransBeActionIncreased | ||
mayTransBeActionPostponed | ||
mcrContinuityModelId | Returns the inventory forecast model ID for the current master plan. | |
mcrIncludePastDueContinuity | Returns a boolean value indicating whether to include past due continuity forecast orders. | |
mcrMustContinuityInventBeCreated | Determines whether the continuity invent records should be created. | |
mcrMustContinuityMasterPlanBeCreated | Determines whether continuity master planning records should be created. | |
mcrPastDueContinuityDays | Returns a an integer indicating how many days past due to include for continuity forecast orders. | |
mcrPlanVersionContinuity | Returns the RefRecId for the continuity plan version. | |
mcrTimeFenceContinuityMasterPlan | Gets the time fence for the specified request group Id. | |
mcrUseContinuityPlan | Returns a NoYes indicating whether to use continuity plan. | |
mcrUseProbabilisticContinuity | Returns a NoYes indicating whether to multiply a probability factor for the continuity demand that is generated during continuity scheduling. | |
mustForecastInventBeCreated | Determines if a forecast line should be included in the requirement profile. | |
mustKeepPlannedOrder | ||
mustTransBeActionDerived | ||
mustTransBeActionSet | ||
mustTransBeAutoAuthorized | ||
mustTransBeExploded | ||
mustTransBeFuturesMarked | ||
mustTransBeScheduled | ||
new | ||
newReqSetup | ||
newReqSetupDim | ||
newReqSetupDimReqPo | ||
newReqSetupDimReqTrans | ||
notify | Releases the hold on an object that has called the wait method on this object. (Inherited from Object.) | |
notifyAll | Releases a lock on the object that was issued by the wait method on this object. (Inherited from Object.) | |
objectOnServer | Determines whether the object is on a server. (Inherited from Object.) | |
owner | Returns the instance that owns the object. (Inherited from Object.) | |
parmDisableDbCache | Gets or sets the DisableDbCache parameter. | |
parmProcessId | Gets or sets the ProcessId parameter. | |
parmReqPlanId | Gets or sets the ReqPlanId parameter. | |
parmReqPlanVersionRefRecId | Gets or sets the ReqPlanVersionRefRecId parameter. | |
parmTodaysDate | ||
parmUseReqTransCache | Gets or sets the UseReqTransCache parameter. | |
parmUseSetupCache | Gets or sets the UseSetupCache parameter. | |
parmUseSetupDimCache | Gets or sets the UseSetupDimCache parameter. | |
pdsUseShelfLife | Indicates whether the default shelf life functionality is enabled for master plan. | |
quotationProbabilityId | ||
reqLog | ||
reqReduceType | Retrieves the forecast reduction principle. | |
reqTimeFutures | Retrieves the future time that determines when a receipt is considered late. | |
reqTimePoDefault | ||
reqTraceLogger | Gets a single instance of the master planning trace logger. | |
reqTransCache | ||
restoreReqLog | ||
schedMarginBackward | Backwards schedules a date on the calendar based on the specified parameters. | |
schedMarginForward | Forward schedules a date on the calendar based on the specified parameters. | |
schedReqDateIssue | Backwards schedules a date on the calendar based on the issue margin of the specified requirements. | |
schedReqDateOrder | Backwards schedules a date on the calendar based on the order margin of the specified requirements. | |
schedReqDateReceipt | Forward schedules a date on the calendar based on the receipt margin of the specified requirements. | |
schedReqPoBackward | Backwards schedules the specified planned order date based on the lead time and requirement setup. | |
schedReqPoForward | Forward schedules the specified planned order date based on the lead time and requirement setup. | |
searchTradeAgreement | ||
searchTradeMethod | ||
sequenceLogId | Retrieves the number sequence record ID for the master planning log numbers. | |
sequencePlannedOrder | Retrieves the number sequence record ID for the planned orders number sequence. | |
setTimeOut | Sets up the scheduled execution of a specified method. (Inherited from Object.) | |
subReqLog | ||
timeFenceAction | ||
timeFenceAuthorization | ||
timeFenceBackRequisition | Retrieves the backward requisition time fence. | |
timeFenceBottleneckCap | ||
timeFenceCapacity | ||
timeFenceCoverage | ||
timeFenceExplosion | ||
timeFenceFiniteCap | ||
timeFenceForecast | Retrieves the forecast time fence for a specific item and coverage dimensions. | |
timeFenceFutures | ||
timeFenceLocking | ||
todaysdate | Returns the system date if it is an open date/time according to the calendar or else the next open date. | |
toString | Returns a string that represents the current object. (Inherited from Object.) | |
usageCount | Returns the current number of references, that is, the value of the reference counter, that the object has. (Inherited from Object.) | |
useForecastDemand | Indicates if demand forecast should be included in the requirement profile. | |
useForecastSupply | Indicates whether the supply forecast should be included in the requirement profile. | |
useInsertList | ||
useInventOnHands | ||
useLockingTimeFence | ||
useMovements | ||
useQuotations | ||
useRequestsForQuote | ||
useViewCache | ||
wait | Pauses a process. (Inherited from Object.) | |
workCalendarSched | ||
xml | Returns an XML string that represents the current object. (Inherited from Object.) | |
::construct | ||
::currentDateTime | Gets the current date/time in the master planning time zone. | |
::newReqCalc | ||
::newReqPlanId | ||
::newReqPlanVersion | Creates a new instance of the ReqPlanData class. | |
::scheduleDateOnTheServer | Schedules a date on the calendar based on the specified parameters. |
Top
Inheritance Hierarchy
Object Class
ReqPlanData Class
MCRReqPlanData_Continuity Class
ReqPlanData_Forecast Class
ReqPlanData_Sched Class