RPayCalculate.correctedPeriod Method [AX 2012]
Gets or sets the corrected period.
Syntax
public ReportPeriod_RU correctedPeriod([ReportPeriod_RU _correctedPeriod])
Run On
Server
Parameters
- _correctedPeriod
Type: ReportPeriod_RU Extended Data Type
The corrected period, set if specified.
Return Value
Type: ReportPeriod_RU Extended Data Type
Corredted period.