ReqDemPlanDateConverter.addPeriods Method [AX 2012]
Adds date periods to a date.
Syntax
public date addPeriods(
date _baseDate,
ReqDemPlanDateGranularity _granularity,
int _periodsToAdd)
Run On
Called
Parameters
- _baseDate
Type: date
The base date to add periods to.
- _granularity
Type: ReqDemPlanDateGranularity Enumeration
The date granularity.
- _periodsToAdd
Type: int
The number of periods to add.
Return Value
Type: date
The new date value.