RemainingDuration Element

The amount of time required to complete the unfinished portion of a task.

<RemainingDuration>
  DurationValue
</RemainingDuration>

Parent Elements

Task

Occurrences

Minimum: 0

Maximum: 1

Remarks

Remaining duration can be calculated in two ways, either based on percent complete or on actual duration.