Finish Element
For a Task, Resource, or Assignment element, Finish is the date and time that a task is scheduled to be completed.
For a Baseline element, it is the scheduled finish date of the task, resource, or assignment when the baseline was saved.
For a TimephasedData element, it is the finish date of the timephased data period in the task, resource, assignment, or baseline.
For Sprints, the finish date of the sprint.
<Finish>
DateTimeValue
</Finish>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |