ActualDuration Element
The span of actual working time for a task so far, based on the scheduled duration and current remaining work or percent complete. Actual duration can be calculated in two ways, either based on percent complete or remaining duration.
<ActualDuration>
DurationValue
</ActualDuration>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |