Power BI Manufacturing app KPIs and measures
APPLIES TO: Generally available in Business Central 2024 release wave 2 (version 25.1).
This page provides a list of all Key Performance Indicators (KPIs) included in the semantic model for the Power BI Manufacturing report.
Explore the list of KPIs below to learn more about how they can help you achieve your business goals.
Each KPI is described, including how it is calculated and what data was used in the calculations.
Capacity KPIs
- Capacity Cost Amt. Deviation %
- Capacity Cost Amt. Variance
- Capacity Used Deviation %
- Capacity Used Variance (Hours)
- Direct Cost Deviation %
- Direct Cost Variance
- Expected Capacity Need %
- Load %
- Overhead Cost Deviation %
- Overhead Cost Variance
- Scrap %
- Utilization %
Capacity Cost Amt. Deviation%
Formula
This measure calculates the deviation between the actual capacity cost amount and the expected capacity cost amount, expressed as a percentage.
Capacity Cost Amt. Deviation % = (Capacity Cost Amt. (Actual) - Expected Capacity Cost Amount)/ Expected Capacity Cost Amount
Data Sources
- Item Ledger Entry
Capacity Cost Amt. Variance
Formula
This measure calculates the variance between the expected cost of capacity utilization and the actual cost of capacity utilization.
Capacity Cost Amt. Variance = -(Expected Capacity Cost Amount - Capacity Cost Amt. (Actual))
Data Sources
- Capacity Ledger Entry
- Prod. Order Routing Line
Capacity Used Deviation%
Formula
Capacity Used Deviation = ( Capacity Used (Hours) - Expected Capacity Need (Hours) ) / Expected Capacity Need (Hours)
Data Sources
- Capacity Ledger Entry
- Prod. Order Routing Line
Capacity Used Variance (Hours)
Formula
This measure shows the variance between the expected capacity need and the actual capacity used.
Capacity Used Variance (Hours) = -(Expected Capacity Need (Hours) - Capacity Used (Hours))
Data Sources
- Prod. Order Routing Line
- Capacity Ledger Entry
Direct Cost Deviation%
Formula
Direct Cost Deviation = ( Direct Cost - Expected Operation Cost Amt. ) / Expected Operation Cost Amt.
Data Sources
- Prod. Order Routing Line
- Capacity Ledger Entry
Direct Cost Variance
Formula
Direct Cost Variance = Expected Operation Cost Amt. - Direct Cost
Data Sources
- Prod. Order Routing Line
- Capacity Ledger Entry
Expected Capacity Need%
Formula
Expected Capacity Need % = Expected Capacity Need (Hours) / Capacity Available (Hours) Data Sources
- Prod. Order Routing Line
- Calendar Entry
Load%
Formula
This measure is calculates the percentage of available capacity that is currently being utilized, expressed as a percentage..
Load % = Allocated Time (Hours) / Capacity Available (Hours)
Data Sources
- Calendar Entry
- Prod. Order Routing Line
Overhead Cost Deviation%
Formula
Overhead Cost Deviation % = ( Overhead Cost - Expected Capacity Ovhd. Cost ) / Expected Capacity Ovhd. Cost
Data Sources
- Prod. Order Routing Line
- Capacity Ledger Entry
Overhead Cost Variance
Formula
Overhead Cost Variance = Expected Capacity Ovhd. Cost - Overhead Cost
Data Sources
- Prod. Order Routing Line
- Capacity Ledger Entry
Scrap%
Formula
Scrap % = Capacity Scrap Qty. / Capacity Output Qty.
Data Source
- Capacity Ledger Entry
Utilization%
Formula
Utilization % = Capacity Used (Hours) / Capacity Available (Hours)
Data Source
- Capacity Ledger Entry
- Calendar Entry
Capacity Measures
- Allocated Time (Hours)
- Capacity Available (Hours)
- Capacity Cost Amt. (Actual)
- Capacity Output Qty.
- Capacity Scrap Qty.
- Capacity Used (Hours)
- Capacity Used per Unit (Hours)
- Direct Cost
- Expected Capacity Cost Amount
- Expected Capacity Need (Hours)
- Expected Capacity Ovhd. Cost
- Expected Operation Cost Amt.
- Overhead Cost
- Run Time (Hours)
- Run Time per Unit (Hours)
- Setup Time
- Setup Time per Unit (Hours)
- Stop Time
- Stop Time per Unit (Hours)
Allocated Time (Hours)
Formula
- This measure shows the amount of time in hours that are allocated for production order routing lines by summing up all the allocated time values from the Production Data table.
Data Sources
- Prod. Order Capacity Need
- Prod. Order Routing Line
Capacity Available (Hours)
Formula
- This measure shows the total amount of available capacity in hours by summing up all capacity available values from the Production Data table.
Data Sources
- Calendar Entry
Capacity Cost Amt. (Actual)
Formula
This measure calculates the actual cost of capacity utilization for a given period by summing up the Direct Cost and the Overhead Cost. The Direct Cost represents the direct expenses incurred in producing a product, while the Overhead Cost represents the indirect expenses incurred in producing a product, such as rent, utilities, and maintenance.
Capacity Cost Amt. (Actual) = Direct Cost + Overhead Cost
Data Sources
- Capacity Ledger Entry
Capacity Output Qty.
Formula
- This measure calculates the total Capacity Output Quantity in a given period by summing up the output quantity for each capacity ledger entry from the Production Data table.
Data Sources
- Capacity Ledger Entry
Capacity Scrap Qty.
Formula
- This measure calculates the total scrap quantity in a given period by summing up the scrap quantity for each capacity ledger entry from the Production Data table.
Data Sources
- Capacity Ledger Entry
Capacity Used (Hours)
Formula
- This measure shows the total number of capacity hours used by summing up the capacity requirement for each production activity from the Production Data table.
Data Sources
- Capacity Ledger Entry
Capacity Used per Unit (Hours)
Formula
This measure shows the amount of capacity utilized to produce a single unit of a product.
Capacity Used per Unit (Hours) = Capacity Used (Hours) / Finished Quantity (Base)
Data Sources
- Capacity Ledger Entry
Direct Cost
Formula
- This measure calculates the direct cost by summing up the Direct Cost for each capacity ledger entry from the Production Data table.
Data Sources
- Capacity Ledger Entry
Expected Capacity Cost Amount
Formula
This measure calculates the expected cost of capacity utilization for a given period by summing up the Expected Operation Cost Amount and the Expected Capacity Overhead Cost. The Expected Operation Cost Amount represents the expected cost of operating the equipment or machinery used in production, while the Expected Capacity Overhead Cost represents the expected cost of indirect resources used in production, such as rent, utilities, and maintenance.
Expected Capacity Cost Amount = Expected Operation Cost Amount + Expected Capacity Overhead Cost
Data Sources
- Prod. Order Routing Line
Expected Capacity Need (Hours)
Formula
- This measure shows the expected total capacity required for production by summing up the expected capacity need (in hours) for each production activity from the Production Data table.
Data Sources
- Prod. Order Routing Line
Expected Capacity Ovhd. Cost
Formula
- This measure calculates the Expected Capacity Ovhd. Cost by summing up the Expected Capacity Ovhd. Cost for each Prod. Order Routing Line from the Production Data table.
Data Sources
- Prod. Order Routing Line
Expected Operation Cost Amt.
Formula
- This measure calculates the Expected Operation Cost Amt. by summing up the Expected Operation Cost Amt. for each Prod. Order Routing Line from the Production Data table.
Data Sources
- Prod. Order Routing Line
Overhead Cost
Formula
- This measure calculates the Overhead Cost by summing up the Overhead Cost for each Capacity Ledger Entry from the Production Data table.
Data Sources
- Capacity Ledger Entry
Run Time (Hours)
Formula
- This measure calculates the Run Time (Hours) by summing up the Run Time (Hr.) for each Capacity Ledger Entry from the Production Data table.
Data Sources
- Capacity Ledger Entry
Run Time per Unit (Hours)
Formula
This measure is shows the amount of time required to produce a single unit of a product.
Run Time per Unit (Hours) = Run Time (Hours) / Finished Quantity (Base)
Data Sources
- Capacity Ledger Entry
Setup Time (Hours)
Formula
- This measure calculates the Setup Time (Hours) by summing up the Setup Time (Hr.) for each Capacity Ledger Entry from the Production Data table
Data Sources
- Capacity Ledger Entry
Setup Time per Unit (Hours)
Formula
This measure shows the amount of time required to set up a machine or equipment for production.
Setup Time per Unit (Hours) = Setup Time (Hours) / Finished Quantity (Base)
Data Sources
- Capacity Ledger Entry
Stop Time (Hours)
Formula
- This measure calculates the Stop Time (Hours) by summing up the Stop Time (Hr.) for each Capacity Ledger Entry from the Production Data table
Data Sources
- Capacity Ledger Entry
Stop Time per Unit (Hours)
Formula
This measure shows the amount of time lost due to equipment downtime or stoppages, per unit produced.
Stop Time per Unit (Hours) = Stop Time (Hours) / Finished Quantity (Base)
Data Sources
- Capacity Ledger Entry
Consumption KPIs
- % Consumed
- % Consumption Rem.
- Consumption Cost Amt. Deviation %
- Consumption Cost Amt. Variance
- Consumption Qty. Deviation %
- Consumption Qty. Variance
%Consumed
Formula
Qty. Consumed (Base) / Expected Consumption Qty. (Base)
Data Sources
- Item Ledger Entry
- Prod. Order Component
%Consumed Rem.
Formula
Rem. Qty. to Consume (Base) / Expected Consumption Qty. (Base)
Data Sources
- Prod. Order Component
Consumption Cost Amt. Deviation%
Formula
This measure calculates the deviation between the actual consumption cost amount and the expected consumption cost amount, expressed as a percentage.
Consumption Cost Amt. Deviation % = (Consumed Cost Amount (Actual) - Expected Consumption Cost Amount) / Expected Consumption Cost Amount
Data Sources
- Item Ledger Entry
- Prod. Order Component
Consumption Cost Amt. Variance
Formula
This measure shows the variance between the expected cost of consumed items and the actual cost of consumed items.
Consumption Cost Amt. Variance = -(Expected Consumption Cost Amount - Consumed Cost Amount (Actual))
Data Sources
- Prod. Order Component
- Item Ledger Entry
Consumption Qty. Deviation%
Formula
( Qty. Consumed (Base) - Expected Consumption Qty. (Base) ) / Expected Consumption Qty. (Base)
Data Sources
- Prod. Order Component
- Item Ledger Entry
Consumption Qty. Variance
Formula
Expected Consumption Qty. (Base) - Qty. Consumed (Base)
Data Sources
- Prod. Order Component
- Item Ledger Entry
Consumption Measures
- Consumed Cost Amount (Actual)
- Expected Consumption Cost Amount
- Expected Consumption Qty. (Base)
- Qty. Consumed (Base)
- Rem. Consumption Cost Amt.
- Rem. Qty. to Consume (Base)
Consumed Cost Amount (Actual)
Formula
- This measure shows the actual cost of consumed items for a given period by summing up the actual cost of each item used in production. To calculate this cost amount, the measure calculates the sum of the actual cost of items consumed from the Production Data Table, filtered for the Consumption data source.
Data Sources
- Item Ledger Entry
Expected Consumption Cost Amount
Formula
- This measure shows the expected cost of consumed items for a given period by summing up the expected consumption cost of each item used in production. To calculate this cost amount, the measure multiplies the expected consumption quantity of each item by its related unit cost and then sums up the results from the Production Data table.
Data Sources
- Prod. Order Component
Expected Consumption Qty. (Base)
Formula
- This measure calculates the expected consumption quantity by summing up the Expected Consumption Qty. (Base) for each Prod. Order Component from the Production Data table.
Data Sources
- Prod. Order Component
Qty. Consumed (Base)
Formula
- This measure calculates the quantity consumed by summing up Quantity for each consumption Item Ledger Entry from the Production Data table.
Data Sources
- Item Ledger Entry
Rem. Consumption Cost Amt.
Formula
- The Rem. Consumption Cost Amt. measure calculates the total remaining consumption cost for production order components. It filters the Production Data Table to include only rows where the [Data Source] is Prod. Order Component. For these rows, it multiplies the Rem. Qty. to Consume (Base) by the Unit Cost (LCY) from the related Item table.
Data Sources
- Prod. Order Component
- Item
Rem. Qty. to Consume (Base)
Formula
- This measure calculates the remaining quantity to consume by summing up Remaining Qty. (Base) for each consumption Prod. Order Component from the Production Data table.
Data Sources
- Prod. Order Component
Output KPIs
%Finished
Formula
% Finished = ( Finished Quantity (Base) / Expected Quantity (Base) )
Data Sources
- Item Ledger Entry
- Prod. Order Line
%Remaining
Formula
% Remaining = ( Remaining Qty. (Base) / Expected Quantity (Base) )
Data Sources
- Prod. Order Line
Cost Amt. Deviation%
Formula
This measure calculates the deviation between the expected cost amount and the actual cost amount for finished goods produced, expressed as a percentage.
Cost Amt. Deviation % = (Finished Cost Amt. (Actual) - Expected Cost Amt.) / Expected Cost Amt.
Data Sources
- Item Ledger Entry
- Prod. Order Line
Cost Amt. Variance
Formula
This measure calculates the variance between the expected cost amount and the actual cost amount for finished goods produced.
Cost Amt. Variance = -(Expected Cost Amt. - Finished Cost Amt. (Actual))
Data Sources
- Item Ledger Entry
- Prod. Order Line
Qty. Deviation%
Formula
This measure shows the deviation between the expected quantity and the actual quantity produced, expressed as a percentage.
Qty. Deviation % = (Finished Quantity (Base) - Expected Quantity (Base)) / [Expected Quantity (Base)
Data Sources
- Item Ledger Entry
- Prod. Order Line
Qty. Variance
Formula
- This measure calculates the variance between the expected quantity and the actual quantity produced.
Data Sources
- Item Ledger Entry
- Prod. Order Line
Output Measures
- Expected Cost Amt.
- Expected Quantity (Base)
- Finished Cost Amt. (Actual)
- Finished Quantity (Base)
- Remaining Cost Amt.
- Remaining Qty. (Base)
Expected Cost Amt.
Formula
- This measure shows the total expected cost amount by multiplying the quantity (in base units) for each production order line from the Production Data Table by the unit cost (in local currency) for the corresponding item, and summing up the results.
Data Sources
- Prod. Order Line
Expected Quantity (Base)
Formula
- This measure calculates the total expected quantity (in base units) for a given period by summing up the base quantity for each production order line from the Production Data table.
Data Sources
- Prod. Order Line
Finished Cost Amt. (Actual)
Formula
- This measure shows total actual cost amount for finished goods produced by summing up the actual cost amount for each output item ledger entry from the Production Data Table.
Data Sources
- Item Ledger Entry
Finished Quantity (Base)
Formula
- This measure calculates the total quantity of finished products produced in base units over a given period by summing up all the output quantities from the Production Data table.
Data Sources
- Item Ledger Entry
Remaining Cost Amt.
Formula
- This measure calculates the total remaining cost for production order lines. It filters the Production Data Table to include only rows where [Data Source] is Prod. Order Line. For each of these rows, it multiplies [Remaining Qty. (Base)] by the [Unit Cost (LCY)] from the related Item table.
Data Sources
- Prod. Order Line.
- Item
Remaining Qty. (Base)
Formula
- This measure calculates the total remaining quantity for production order lines. It sums the [Remaining Qty. (Base)] column in the Production Data Table, but only for rows where [Data Source] is Prod. Order Line.
Data Sources
- Prod. Order Line
Tip
You can easily track the KPIs that the Power BI reports display against your business objectives. To learn more, go to Track your business KPIs with Power BI metrics.
See also
Track your business KPIs with Power BI metrics
Power BI Manufacturing app
Built-in production reports
Manufacturing overview