Phase 21- Finishing outside of house with PAREX along with outside handrail work.

The finishing phases continue, here are pictures of the outside being completed.

 

DSCF2144

Outside gets PAREX finish which has the paint color already added to it.

Final Phase begins.

DSCF2151

Work on handrails continues while decking is sealed.

 

DSCF2145

Getting ready to dig trench for the underground power.