Phase 21- Finishing outside of house with PAREX along with outside handrail work.
The finishing phases continue, here are pictures of the outside being completed.
Outside gets PAREX finish which has the paint color already added to it.
Final Phase begins.
Work on handrails continues while decking is sealed.
Getting ready to dig trench for the underground power.