Share via


BizTalk 04的SP2 RTW日期推迟到10月15日左右

原定5日发布的SP2 for BizTalk Server 2004, 向后推迟10天左右,SP2主要针对以下方面进行了补充和改进:

Performance issues with different orchestration scenarios

 

EDI transmit fails with certain structures of outgoing messages

Disassembling large flat file messages in the pipeline stalls other processing

The rules engine is not honoring rule priorities correctly in high load

Body tracking doesn’t track the original message

Dynamic send ports causing 10 second delay in subscription

100% CPU in orchestration when calling PrepareForActivationComplete

Messages could still be delivered even though the orchestration instances were zombied

Connection problems with HTTP Request-response requests

Request to turn off FTP Throttling

Memory Leak problem in PipelineContextWrapper/Interop.ResourceTracker

请关注SP2和未来R2 For BTS06的发展动向!