BizTalk 04的SP2 RTW日期推迟到10月15日左右
原定5日发布的SP2 for BizTalk Server 2004, 向后推迟10天左右,SP2主要针对以下方面进行了补充和改进:
Performance issues with different orchestration scenarios
EDI transmit fails with certain structures of outgoing messages
Disassembling large flat file messages in the pipeline stalls other processing
The rules engine is not honoring rule priorities correctly in high load
Body tracking doesn’t track the original message
Dynamic send ports causing 10 second delay in subscription
100% CPU in orchestration when calling PrepareForActivationComplete
Messages could still be delivered even though the orchestration instances were zombied
Connection problems with HTTP Request-response requests
Request to turn off FTP Throttling
Memory Leak problem in PipelineContextWrapper/Interop.ResourceTracker
请关注SP2和未来R2 For BTS06的发展动向!