Freigeben über


IHostTaskManager::SwitchToTask Method

Notifies the host that it should switch out the current task.

HRESULT SwitchToTask (
    [in] DWORD option
);

Parameters

  • option
    [in] One of the WAIT_OPTION Enumeration values, indicating the action the host should take if the requested operation blocks.

Return Value

HRESULT Description

S_OK

SwitchToTask returned successfully.

HOST_E_CLRNOTAVAILABLE

The common language runtime (CLR) has not been loaded into a process, or the CLR is in a state in which it cannot run managed code or process the call successfully.

HOST_E_TIMEOUT

The call timed out.

HOST_E_NOT_OWNER

The caller does not own the lock.

HOST_E_ABANDONED

An event was canceled while a blocked thread or fiber was waiting on it.

E_FAIL

An unknown catastrophic failure occurred. When a method returns E_FAIL, the CLR is no longer usable within the process. Subsequent calls to hosting methods return HOST_E_CLRNOTAVAILABLE.

Remarks

The host can switch in another task as desired or needed.

Note

SwitchToTask does not specify which task the host should switch to; it specifies only the task that it should switch from.

Requirements

Platforms: Windows 2000, Windows XP, Windows Server 2003 family

Header: MSCorEE.idl

Library: Included as a resource in MSCorEE.dll

.NET Framework Version: 2.0

See Also

Reference

ICLRTask Interface
ICLRTaskManager Interface
IHostTask Interface
IHostTaskManager Interface