Freigeben über


Exchange 2007 SP1 Beta posted to MSDN and TechNet

The beta for Exchange 2007 SP1 has been posted to MSDN and TechNet for download.  Weighing in at a hefty 717MB, it looks like the Exchange Team has been busy.

You will of course want to limit this beta to a dev/test environment, while we work the bugs out prior to release.

I have covered the new features of the Service Pack here, and you can download the official release notes here: https://download.microsoft.com/download/5/e/6/5e672458-592a-44a2-b489-11cec19d3c82/RelNotes.htm

Comments

  • Anonymous
    June 10, 2015
    Beijing on June 10 morning news, according to Bloomberg survey report GTM Research and the American Solar Energy Industries Association released the first quarter of this year, US home solar power system capacity increase of 76% over last year, to 437 megawatts (MW) ,Solar Batteries http://www.poweroak.net the nation's new generating capacity, more than half of which is a photovoltaic power generation. The report shows that a quarter of the US solar power capacity by 1.3 gigawatts (GW), the sixth consecutive quarterly increase of over 1 GW. The total annual installed capacity is expected to reach 7.9 GW, Solar Power Peneratorhttp://www.poweroak.net , Solar Power Pack http://www.poweroak.net representing an increase of 27%.
    The report predicts that by 2016 solar power will meet the electricity needs of about 800 million households in the United States to offset 45 million metric tons of carbon emissions, equivalent to removing 10 million cars. energy storage systemhttp://www.poweroak.net/energy-storage-system-c-1.html