Freigeben über


Team Foundation Server 2012 and Project Server 2013 Integration Virtual Machine and Hands-on-Labs / Demo Scripts

9/29/2016 Update: Please note that Microsoft's integration of Team Foundation Server / Project Server has been discontinued. The content of this post is provided "as is" for teams who wish to continue to use this integration with previous releases, but starting with the next major release of Team Foundation Server after TFS 2015, this integration will no longer be provided by Microsoft. There is a partner solution available. More details can be found at https://blogs.msdn.microsoft.com/visualstudioalm/2016/09/16/microsoft-discontinuing-project-server-tfs-integration/
++++++++++++
I am pleased to announce the availability of a new virtual machine which demonstrates the integration of Team Foundation Server 2012 with Project Server 2013. This integration scenario was first introduced with Team Foundation Server 2010 and Project Server 2010, but this virtual machine was updated to showcase this integration scenario using the latest software releases.

This integration enables the Project Management Office (PMO) to see a consolidated view of the progress and resource availability across all software development projects in Team Foundation Server.  Software teams using Team Foundation Server can choose to manage their projects using a formal process or an agile process and flow their status and schedule updates into Project Server and Project Managers can preview changes as they flow in, track the work at a high-level and provide live updates to their stakeholders.

This virtual machine is pre-configured with this integration along with sample data and several walkthroughs (which can either be used as self-paced hands-on-labs, or demo scripts to present these capabilities to others). The following instructions should make it easier for you to batch download all of the files required for this release.

Downloading the virtual machine and associated files:
I suggest using a download manager for these files since they are very large. My download manager of choice is Free Download Manager. You can use your own favorite download manager, but you may need to adapt the instructions below as appropriate.

  1. Download and install Free Download Manager. This utility provides:

    • Auto-resume support for interrupted downloads.
    • Multiple simultaneous download streams for (usually) a much faster download experience.
    • As the name implies, it's completely free.
  2. Select the appropriate URL’s depending on your preferred virtualization platform and copy (CTRL+C) them to your clipboard.
    ###Select This Section and Copy It (CTRL+C) - Do Not Include This Line###
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/Working with the Project Server 2013 and Team Foundation Server 2012 Integration Virtual Machine.docx

    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/1 - Top-Down Planning of Business Requirements in Project using Team Foundation Server 2012 and Project Server 2013.docx
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/2 - Managing Project Details in a Project Plan Mapped to a Team Project in Team Foundation Server 2012.docx

    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/3 - Making Agile Team Progress Visible to the Project Management Office (PMO).docx
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/4 - Managing Field Mappings for Integration of Team Foundation Server and Project Server.docx

    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part01.exe
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part02.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part03.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part04.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part05.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part06.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part07.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part08.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part09.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part10.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part11.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part12.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part13.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part14.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part15.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part16.rar
    https://download.microsoft.com/download/6/2/F/62FCF6CB-A796-4DA5-B895-97726C5CB569/TFS2012-PS2013.part17.rar
    ###End - Do Not Include This Row In Your Selection###

  3. Launch the user interface for Free Download Manager (either from the Start Menu or via the system tray icon if FDM is already running).

  4. Click File -> Import -> Import List of URLs from Clipboard.

  5. When prompted for a download group, accept the default and click OK.

  6. You are now free to minimize Free Download Manager while the files download. By default, they will be saved to c:\downloads.

Once you have downloaded the release, extract it to a directory by running the EXE. The document “Working with the Project Server 2012 and Team Foundation Server 2012 Integration Virtual Machine.docx” provides more details about how to load this virtual machine within Hyper-V, and how to activate the operating system to get a full 180 days of usage from this virtual machine. After 180 days from the time you first boot the virtual machine it will expire. If you need additional time you can re-extract a fresh copy of the virtual machine, or restore to a Hyper-V snapshot if you took one at a time prior to booting it up for the first time.

After you have successfully setup this virtual machine within your Hyper-V environment you can begin using the walkthroughs to learn more about the scenarios enabled by this integration. Those walkthroughs are also included in the list of files above as Word documents, and are numbered 1-4. It is recommended, though not required, that you complete these labs in the order they are numbered. You should also consider using Hyper-V snapshots prior to following the steps in a walkthrough so that you can roll back to an earlier snapshot if you would like to complete a walkthrough multiple times, or if you make a mistake.

DemoMates
If you want to learn about this integration but don’t have time to download the virtual machine, you can use the following DemoMates. DemoMates are useful for being able to “click through” the scenarios above without needing to download and run the virtual machine.

Online DemoMates:

 

Offline DemoMates: (installed locally on your computer)

I hope you enjoy this content. If you have suggestions for how to improve this virtual machine and set of demos / hands-on-labs please let me know.

Comments